
11875-95 Av. Bellevois
Construction of two contemporary residential buildings of 4 floors, 8 units of type 5½ each, following the demolition of an industrial site.
Location
Montreal North
Scope
16 residential units (2 × 8)
Status
Start August 2026
Project gallery
1 pictures
About the project
A project to redevelop an industrial site in Montreal North as a 16-unit residential complex.
Separate and complete demolition/site preparation phase before construction
Parallel planning of the two buildings to optimize deadlines
Selection of materials oriented towards durability and thermal performance
A similar project in mind?
Share your idea with us. We assess the feasibility, we structure the mandate and we come back to you with a clear approach.
Other projects
See all

7388 Rue St-Jacques
Contemporary 4-story residential building, 43 units with mezzanines and roof terraces. Hybrid steel-concrete structure.
Contemporary 4-story residential building, 43 units with mezzanines and roof terraces. Hybrid steel-concrete structure.


6717 Av. Christophe Colomb
Residential building of 38 condominiums with controlled contemporary architecture, masonry in contrasting colors and elegantly integrated balconies.
Residential building of 38 condominiums with controlled contemporary architecture, masonry in contrasting colors and elegantly integrated balconies.


4750 Boul. Gouin East
Construction of a mixed building of 15 residential units and commercial premises.
Construction of a mixed building of 15 residential units and commercial premises.
Let's talk about your project.
Tell us about your project and our team will contact you within 24 hours to discuss how we can realize your vision.
Phone
(514) 549-2586
info@groupemonarch.ca
Desk
3861 Boul. Saint-Laurent CP 42051, Montreal, QC H2W 1X9
Our commitments
- Response within 24 business hours
- Detailed and transparent submission
- Certified team, active RBQ license